Feedback from Pre-Testing

Feedback from Pre-Testing

When working without a detailed specification document, many questions only arrive once the prototype is finished, resulting in multiple feedback loops with smaller odr larger changes to the survey software. This is an example for a feeback document after a prototype was tested.

File Name: Feedbackall CC Final-1611-2017.pdf
File Size: 183.19 KB
File Type: application/pdf
Created Date: 2021-08-26
Last Updated Date: 2021-08-26